Infrared Thermography
Humbert Copper Connect LLC. offers infrared scanning. Thermal Imaging is a valuable tool that can find possible problems with your electrical switchgear.
We can offer these services as a preventative maintenance service, or as an installation verification.
HCC maintains the latest up to date Fluke equipment and software. Used as a diagnostic tool, Thermography allows corrective actions before very costly failures and faults take place.
Infrared Thermography is the most powerful and cost effective preventative maintenance tool available today!

Prepared for Humbert Copper Connect



| Panel_PIP.is2 | Visible Light Reference |
It appears the two hot connections may be
overloaded.
Annotations
| Location | Building 1 |
| Equipment | Breaker |
| Potential Problem | Overload |
| Severity | Yellow |
| Recommended Action | Monitor |
Markers
| Label | Temperature | Emissivity | Background |
| P0 | 109.9 °F | 0.95 | 68.0 °F |
| P1 | 116.2 °F | 0.95 | 68.0 °F |



| Main_IR.is2 | Visible Light Reference |
A phase appears to be severly out of balance.
Annotations
| Location | Building 2 |
| Equipment | Capacitor |
| Potential Problem | Overload |
| Severity | Red |
| Recommended Action | Schedule Maintenance |
Markers
| Label | Temperature | Emissivity | Background |
| P0 | 274.8 °F | 0.98 | 68.0 °F |
| P1 | 197.5 °F | 0.98 | 68.0 °F |
| P2 | 162.5 °F | 0.98 | 68.0 °F |


| 3_Phase_Labeled_PIP.is2 | Visible Light Reference |
There is a strong imbalance that may be due to a
blown fuse. Schedule maintenance to inspect the
fuses and load levels.
Annotations
| Location | Building 2 |
| Equipment | Disconnect |
| Potential Problem | Imbalance |
| Severity | Red |
| Recommended Action | Schedule Maintenance |
Markers
| Label | Average | Minimum | Maximum | Emissivity | Background | Std. Dev. |
| B Phase | 126.7 °F | 96.2 °F | 144.3 °F | 0.98 | 68.0 °F | 6.028 |
| C Phase | 118.5 °F | 89.2 °F | 137.3 °F | 0.98 | 68.0 °F | 7.299 |
| A Phase | 104.2 °F | 86.6 °F | 117.6 °F | 0.98 | 68.0 °F | 2.789 |


| B2_Panel_Full_Screen.is2 | Visible Light Reference |
It appears 2 or 3 connections may be overloaded.
Schedule maintenance to determine load
requirements.
Annotations
| Location | Building 2 |
| Equipment | Breaker |
| Potential Problem | Overload |
| Severity | Red |
| Recommended Action | Schedule Maintenance |
Markers
| Label | Temperature | Emissivity | Background |
| P0 | 128.8 °F | 0.95 | 68.0 °F |
| P1 | 138.9 °F | 0.95 | 68.0 °F |
| P2 | 146.6 °F | 0.95 | 68.0 °F |